Worked in a Consortium,
Construction of 2 parallel mine portals, in soft soil and two 4 km deep tunnels. Each one with a 15% negative slope and 25 m2 of section.
It is important to emphasize that this project was delivered 7 months before the contractual term. ZAMORA CHINCHIPE 2015