DUE
HYDROLECTRIC
PROJECT LOADING
TUNNEL SUCUMBÍOS 2019
5.50 x 5.50m tunnel in a horseshoe section, lined with concrete of 4.80 m in diameter and 2,832 m long, leading to a pressure pipe made of steel, 1,600 m long. and diameter 4.50 m
SUCUMBÍOS 2019
RELATED WORKS
AREAS OF EXPERTISEAREAS OF
EXPERTISE
TÚNELES
AREAS DE
EXPERIENCIA