BIO GAS –
ZÁMBIZA, G.A.S.















QUITO 2006 - 2007 Energietechnologie GmbH, Technology for Green Energy, Quito, 2006 to 2007, in the former garbage dump of the city of Quito 70,000 m2 of platform reconfiguration were carried out, in which 58 wells of 0.80 m diameter were drilled, with an average depth of 25 m.