HYDROELECTRIC
PROJECT DUE SUCUMBIOS 2015
The work consists of a 133.45 m detour dam, with two overflow spillways, 6 6 m wide gate channels and two concrete dams. After a transition section, it enters a tunnel of 5.50 x 5.50 m in a horseshoe section (lined with concrete with a diameter of 4.80 m) and 2,832 m in length.