HYDROELECTRIC
PROJECT DUE
SUCUMBIOS 2015 The work consists of a 133.45 m detour dam, with two overflow spillways, 6 6 m wide gate channels and two concrete dams. After a transition section, it enters a tunnel of 5.50 x 5.50 m in a horseshoe section (lined with concrete with a diameter of 4.80 m) and 2,832 m in length.
AREAS OF EXPERTISE AREAS OF
EXPERTISE
AREAS OF
EXPERTISE
OBRAS CIVILES

DELIVERED WORKS

_
subestacion-electrica

2015

READ MORE

EL INGA ELECTRIC SUBSTATION

presa-Mula-Corral

2003- 2006

READ MORE

MULACORRAL DAM

central-hidroelectrica-pisayambo

1968

READ MORE

PISAYAMBO HYDROELECTRIC POWER STATION

CIVIL
WORKS