GUAYAQUIL 2005-2006
35 m long bridge, excavation, filler for bridge and approach, construction of the 800 mm and 1000 mm pre-stressed piles, protection works, construction of footings, retaining wall, wing walls, construction of metal beams and panel slab, railings, asphalt primer, road signs.
AREAS OF EXPERTISEAREAS OF
EXPERTISE
AREAS OF
EXPERTISEPUENTES Y VIADUCTOS